Sedona AZ (August 11, 2015) – DeTar Construction, Inc. and Rocky Construction, Inc. will be excavating and installing a 6” water main across Rodeo Road between Bennett Way and Highway 89A. During the construction there will be lane closures on Rodeo Road with one way traffic to install the water main. The lane closures are expected to start on August 10 and should be completed by August 21.
Contacts for this project will be Brandon DeTar of DeTar Construction, Inc. at (928) 451-1703 and Marlin Parker of Rocky Construction, Inc. at (928) 220-0003.