Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde Valley Sedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona
      • Steve’s Corner
      • Arts and Entertainment
      • Bear Howard Chronicles
      • Business Profiles
      • City of Sedona
      • Goodies & Freebies
      • Mind & Body
      • Real Estate
      • Sedona News
    • Opinion
    • About
    • The Sedonan
    • Advertise
    • Sedona’s Best
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home»Sedona News»City of Sedona»City begins construction of the Uptown Northbound Improvements Project
    City of Sedona

    City begins construction of the Uptown Northbound Improvements Project

    November 30, 2023No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    20231130 city01
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    Sedona News – The city of Sedona and contractor, Combs Construction Company, recently began work on the Uptown Northbound Roadway Improvements Project, with the goal of completing the project by March 2024.

    20231130 city02

    The project’s purpose is to reduce the traffic congestion for northbound travelers on State Route (SR) 89A through Uptown by:

    Own In Sedona

    Own In Sedona

    • Adding an additional northbound lane, between L’Auberge Lane and Forest Road.
    • Removing and replacing the existing curb and gutter along the east side of SR 89A (between L’Auberge Lane and Forest Road).
    • Constructing a permanent barrier for the left turn lane onto Forest Road.
    • Converting the sidewalk along SR 89A into a new shared-use pathway that will be separated from the highway.
    • Removing parking spaces along the northbound lane of SR 89A (between Forest Road and the Jordan Road Roundabout).
    • Adjusting traffic signal timing to improve traffic flow.
    • Installing new retaining walls, signage, landscaping and storm drain system upgrades along the project corridor.

    Following completion of the work referenced above, sections of distressed pavement along the northbound lane of SR 89A will be removed and replaced (between the Jordan Road Roundabout and Art Barn Road). Please note that this portion of the work will likely occur in late summer 2024.

    Sedona Gift Shop

    As part of the city’s Sedona in Motion program, this project will also help with traffic along SR 89A that often spills back to the “Y” roundabout and creates further congestion for both SR 179 and northbound SR 89A to Cooks Hill.

    To complete this project as quickly as possible, the contractor will work during both day and night hours. Work may occur Monday through Friday, 7 a.m. to 5 p.m. and 7 p.m. to 5 a.m. Please be aware of lane restrictions; temporary street, sidewalk and driveway closures; reduced speeds; rough road conditions; loud noise and flagging operations throughout the work zone. Driveway access will be maintained as best as possible, however, access may alter on a day-to-day basis with temporary closures necessary at times. The contractor will work to coordinate this work on an individual basis and will communicate alternate means of ingress and egress throughout the project.

    Future communication will be provided via email updates. To receive these updates, send an email request to news@uptownnorthbound.com, visit www.uptownnorthbound.com or call the Project Hotline at (928) 852-4164.

    Healing Paws

    This is an advertisement

    Own In Sedona

    Comments are closed.

    FALL IN LOVE WITH THE QUEENS OF COUNTRY AT BLAZI’M RANCH VALENTINES DAY!

    Looking for a Valentine’s date that actually hits all the right notes? Skip the boring dinner and head to the Ranch!

    On February 14th, we’re kicking off the 2026 Blazin’ M Signature Series with a powerhouse tribute to the women who built country music!

    https://sedona.biz/where-no-one-can-hide/

    The Sedonan
    The Sedonan Summer 2025
    Nampti Spa
    House of Seven Arches
    Need More Customers?
    VV Wine Trail
    Verde Valley Wine Trail
    Bear Howard Chronicles
    Recent Comments
    • Leigh on City invites community to Uptown View Walk ribbon cutting
    • West Sedona Dave on August Is About Governance, Not Personalities
    • Anna Garcia Villanueva on On the Edge – A trigger pull away from Civil War
    • Blue on On the Edge – A trigger pull away from Civil War
    • TJ Hall on On the Edge – A trigger pull away from Civil War
    • Jill Dougherty on On the Edge – A trigger pull away from Civil War
    • JB on On the Edge – A trigger pull away from Civil War
    • JB on America the Less — The “America Go Away” Movement Takes Hold
    • JB on America the Less — The “America Go Away” Movement Takes Hold
    • JB on What Would Tommy Do – Chapter Three
    • JB on America the Less — The “America Go Away” Movement Takes Hold
    • Jill Dougherty on America the Less — The “America Go Away” Movement Takes Hold
    • Hard Pass on America the Less — The “America Go Away” Movement Takes Hold
    • JB on America the Less — The “America Go Away” Movement Takes Hold
    • JB on America the Less — The “America Go Away” Movement Takes Hold
    Archives
    A Step Up
    The Sedonan
    The Sedonan Summer 2025
    Ode to Sleeplessness
    © 2026 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.