Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde Valley Sedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona News
    • Business Profiles
    • Opinion
    • Mind & Body
    • Arts
    • Elections
    • Gift Shop
    • Contact
    • Advertise
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home » Forest Road Connection Project to begin
    Sedona News

    Forest Road Connection Project to begin

    April 21, 2022No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    City of Sedona ArizonaSedona News – As part of the Sedona in Motion (SIM) program, the city of Sedona and their contractor, Fann Contracting, Inc., will begin construction of the Forest Road Connection Project the week of April 25, 2022. 

    The project includes the construction of a new two-lane roadway that will connect the current terminus of Forest Road to a new intersection on State Route 89A, just west of the “Y” roundabouts. Additional work includes the installation of new concrete curb and gutter, retaining walls, a shared-use path, drainage infrastructure, landscape improvements and the extension of sewer infrastructure. Once complete, this project will allow motorists to bypass two busy roundabouts (while reducing traffic in those roundabouts), provide additional access for emergency responders, add an auxiliary evacuation route, and create a new, off-highway, walk and bike connection between Uptown and West Sedona. The project is scheduled to be finished in summer 2023. 

    Starting Monday, April 25, 2022, crews will be mobilizing equipment into the area to identify landscape removal extents ahead of roadwork commencing. Work may occur Monday through Friday, from 7 a.m. to 5:30 p.m. While the majority of this project will not impact traffic, please be aware of loud noise, potential lane closures, reduced speeds, rough road conditions and flagging operations while crews are connecting the new roadway to SR89A.

    Sedona Gift Shop

    To receive regular project updates, obtain additional project information or reach a project team member, email news@forestroadconnection.com or call the Project Hotline at (928) 852-4164.

    Comments are closed.


    The Bloody Machine
    By Tommy Acosta
    What is a life anyway? A single “life?” Is it nothing more than a collection of emotions and thoughts, reverberating pain and pleasure, hopes, dreams and fear? Are we merely meat; flesh and blood creations encapsulating what we believe is a soul? Or is a single life the microcosm and macrocosm of human life on earth, each one of us a unique representation of who we believe we are and the whole of humanity at once? We are born. We grow old. We die. Everything we experience is but a dream between those two points. Or are we manifestations of a Divine Creator, every one of us complete in the image that we were made? So, we are told. Read more→
    Recent Comments
    • Sedona Schnebly on Fighter Jets Fly Over Sedona
    • JB on The Bloody Machine
    • JB on 2023 Welcome Home Vietnam Veteran’s Day Tribute in Camp Verde
    • Ellen Siepser on The Bloody Machine
    • Hey Sean on The Bloody Machine
    Categories
    © 2023 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.