Close Menu
Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona
      • Steve’s Corner
      • Arts and Entertainment
      • Bear Howard Chronicles
      • Business Profiles
      • City of Sedona
      • Goodies & Freebies
      • Mind & Body
      • Real Estate
      • Sedona News
    • Opinion
    • About
    • The Sedonan
    • Advertise
    • Sedona’s Best
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home » ADOT starts I-17 project to improve travel to Flagstaff
    Sedona News

    ADOT starts I-17 project to improve travel to Flagstaff

    April 25, 2018No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    logo_azdotFlagstaff AZ (April 25, 2018) – An Arizona Department of Transportation project scheduled to start Monday, April 30, will deliver a smoother driving surface along 28 miles of northbound Interstate 17 leading to Flagstaff, a stretch battered by repeated cycles of freeze and thaw during the winter.

    In addition to replacing pavement north from the Coconino County line at milepost 312, the $24.4 million project will rebuild 2 miles of the heavily traveled interstate between mileposts 312 and 314.

    20180425_azdot

    Own In Sedona

    Own In Sedona

    Crews will place concrete barriers along the interstate between mileposts 312 and 314 next Monday in order to start rebuilding the right lane. The highway will first be narrowed to the left lane northbound through the work zone. After the right lane has been reconstructed, crews will rebuild the left lane. This one-lane restriction will stay in place until mid-summer.

    A 12-foot vehicle-width restriction will be in place as well as a lowered speed limit throughout the lane restriction.

    Sedona Gift Shop

    Drivers can expect other restrictions as crews replace pavement along the other 26 miles of northbound I-17. Those heading to Flagstaff this summer should budget extra travel time.

    The project also includes replacing the bridge decks in each direction on the I-17 overpass at Willard Springs Road, near milepost 326. Drivers can expect periodic closures of Willard Springs Road and ramp closures.

    The majority of the work is expected to be completed later this fall, with additional work happening next spring.

    ADOT is improving pavement along 182 lane miles of Interstate 40 and Interstate 17 in the Flagstaff area, addressing deterioration caused by snow and snowplowing, freeze-thaw cycles and heavy use by commercial vehicles. In addition, ADOT is replacing the I-40 bridge decks over I-17 and Beulah Boulevard at the I-40/I-17 interchange in Flagstaff.

    For more information on these projects, visit azdot.gov/projects. The public can also stay up-to-date on all projects in the Flagstaff area this summer by attending ADOT open houses from 5:30 p.m. to 7 p.m. May 8, June 12 and July 10 at 1901 S. Milton Road in Flagstaff.

    Own In Sedona

    Comments are closed.

    Understanding Sedona’s Home Rule Vote

    If you recently moved to Sedona, you may notice that every four years, residents vote on something called Home Rule. The July 21 vote is simply about who controls Sedona’s city budget.

    Click Here for More

    No Home Rule

    Home Rule allows the city government, Staff with limitations, and Council to spend any money they have on any project they want without regard to voter input.

    Tony For Council
    Sedona Real Estate
    230 Table Top Rd
    The Sedonan
    The Sedonan Summer 2025
    Recent Comments
    • Grant on LLMs: Can the Human Line Project, a Nonprofit, Solve AI Delusion, Psychosis?
    • Jill Dougherty on They are Elected to Decide, Not to Echo
    • Bruce on They are Elected to Decide, Not to Echo
    • Scott on They are Elected to Decide, Not to Echo
    • Sean Smith on They are Elected to Decide, Not to Echo
    Categories
    Cactus Quill
    Understanding Sedona’s Home Rule Vote

    If you recently moved to Sedona, you may notice that every four years, residents vote on something called Home Rule. The July 21 vote is simply about who controls Sedona’s city budget.

    Click Here for More

    © 2026 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.