Close Menu
Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona
      • Steve’s Corner
      • Arts and Entertainment
      • Bear Howard Chronicles
      • Business Profiles
      • City of Sedona
      • Goodies & Freebies
      • Mind & Body
      • Real Estate
      • Sedona News
    • Opinion
    • About
    • The Sedonan
    • Advertise
    • Sedona’s Best
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home » Thunder Mountain Drainage Improvements Project Set to Begin Soon
    Sedona News

    Thunder Mountain Drainage Improvements Project
    Set to Begin Soon

    March 4, 2020No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    City of Sedona ArizonaSedona AZ (March 4, 2020) – On March 16, 2020, city of Sedona contractor Tiffany Construction Company will begin the Thunder Mountain Drainage Improvements Project, which will begin with utility relocation work, followed by a drainage culvert installation.

    This project involves installing drainage pipes ranging in diameter from 36 to 60 inches along the south side of Thunder Mountain Road between Rhapsody Road and Andante Drive. Before the drainage pipe installation portion of the project can start, it will be necessary to relocate a few short sections of Arizona Water Company water mains. In addition, two sections of city sewer main need to be relocated to a deeper elevation just south of Thunder Mountain Road on Harmony Drive and Concord Drive.

    It is anticipated that the utility relocation work will take approximately five weeks, and the drainage portion of the project will take an additional 11 weeks.

    Own In Sedona

    Own In Sedona

    City of Sedona staff reached out to residents who will be directly impacted by this drainage project, and additionally, Tiffany Construction Company will place notifications at each residence within 300 feet of the project area with up-to-date information as this project begins.

    Sedona Gift Shop

    Throughout this project, Thunder Mountain Road will be closed from just west of Andante Drive to a point just east of Rhapsody Road. When needed, a detour will be set up along Blue Horizon Road via Andante Drive and Rhapsody Road. The contractor will be responsible for traffic control signage and will be working with the Postmaster and garbage collectors to ensure uninterrupted service.

    This project will eliminate the existing open ditch along the south side of Thunder Mountain Road and improve drainage performance in the area. It will also provide the area needed for the second phase of this project, the installation of a “Sedona red” concrete shared use path that is currently in the final stages of design and budgeted for construction between July 1, 2020 and June 30, 2021. The shared use path with extend past this drainage project and connect to Coffee Pot Drive. In addition, this second phase includes roadway milling, repaving and on the south side of Thunder Mountain Road, new concrete curb and gutter.

    For more information regarding the Thunder Mountain Drainage Improvements Project, contact David Peck, associate engineer, city of Sedona Public Works Department at DPeck@SedonaAZ.gov.

    Get more information on this project and other capital improvement projects at www.sedonaaz.gov/CIP.

    Own In Sedona

    Comments are closed.

    Whack – A – Mole War

    It looks like the tried-and-true method of armed conflict where armies face each other and kill until somebody wins or gives up, now all it takes is assassinating the leadership Israeli style. We enter a new phase of war where the leaders are killed first rather than last as in conventional warfare.

    Click Here for More

    Sedona Real Estate
    230 Table Top Rd
    The Sedonan
    The Sedonan Summer 2025
    Recent Comments
    • Jill Dougherty on When the Rulemaker Breaks the Rules: America’s New Global Ripple Effect.
    • JB on Whack-A-Mole War
    • TJ Hall on When the Rulemaker Breaks the Rules: America’s New Global Ripple Effect.
    • John O’Brien on Sedona Public Servants Deserve Respect, Not Insults
    • Mike Johnson on Sedona Public Servants Deserve Respect, Not Insults
    • JB on Whack-A-Mole War
    • Mike Johnson on Sedona Public Servants Deserve Respect, Not Insults
    • TJ Hall on Doesn’t Bode Well for Love
    • TJ Hall on When the Rulemaker Breaks the Rules: America’s New Global Ripple Effect.
    • Andrea Kadar on Heaven Is For Real
    • Buddy Oakes on The Couch Kills
    • Michael Schroeder on The Couch Kills
    • TJ Hall on When the Rulemaker Breaks the Rules: America’s New Global Ripple Effect.
    • JB on The Couch Kills
    • West Sedona Dave on Sedona Public Servants Deserve Respect, Not Insults
    Categories
    Cactus Quill
    © 2026 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.