Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde Valley Sedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona
      • Steve’s Corner
      • Arts and Entertainment
      • Bear Howard Chronicles
      • Business Profiles
      • City of Sedona
      • Goodies & Freebies
      • Mind & Body
      • Real Estate
      • Sedona News
    • Opinion
    • About
    • The Sedonan
    • Advertise
    • Sedona’s Best
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home»Sedona News»Portion of Cathedral Rock Trail to close for construction beginning February 1
    Sedona News

    Portion of Cathedral Rock Trail to close for construction beginning February 1

    January 27, 2023No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    stock usfs coconino cathedralrocktrail
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    Sedona News – The upper portion of Cathedral Rock Trail, located on the Red Rock Ranger District (RRRD), will close for construction February 1 through roughly March 31.

    The area will close to the public while the Red Rock Trail Crew reconstructs rock walls and installs check steps on the trail.

    The closure order may be lifted during February – or extended past March 31 – depending on the duration of trail work.

    Own In Sedona

    Own In Sedona

    The trail will be closing due to the inability to safely reroute hikers around the area. Hazards include the possibility of large rolling rocks and other falling debris during construction.

    Sedona Gift Shop

    Throughout the project, Cathedral Rock Trail will be closed from the Templeton Trail junction to the upper terminus. The area located 200 feet in any direction of the trail will be closed as well.  

    The lower 0.2 miles of the trail – the Cathedral Rock trailhead to the Templeton Trail junction – will remain open to the public during this project.

    Visitors must use the free Sedona Shuttle to access the trailhead during shuttle operation hours. The Sedona Shuttle schedule is available at sedonashuttle.com/routes/route-15.

    During Cathedral Rock trail construction, RRRD visitors are encouraged to seek alternate trail options on the Coconino National Forest website at fs.usda.gov/recmain/coconino/recreation.

    Own In Sedona

    Comments are closed.

    FALL IN LOVE WITH THE QUEENS OF COUNTRY AT BLAZI’M RANCH VALENTINES DAY!

    Looking for a Valentine’s date that actually hits all the right notes? Skip the boring dinner and head to the Ranch!

    On February 14th, we’re kicking off the 2026 Blazin’ M Signature Series with a powerhouse tribute to the women who built country music!

    https://sedona.biz/where-no-one-can-hide/

    Sedona Real Estate
    The Sedonan
    The Sedonan Summer 2025
    Nampti Spa
    House of Seven Arches
    Need More Customers?
    VV Wine Trail
    Verde Valley Wine Trail
    Bear Howard Chronicles
    Recent Comments
    • Hunter Biden (HB) on On the Edge – A trigger pull away from Civil War
    • Hunter Biden on On the Edge – A trigger pull away from Civil War
    • TJ Hall on Ten Shots and a Phone
    • Jill Dougherty on Ten Shots and a Phone
    • JB on Protests, Fear, and the Midterm Vote: ICE and the American Conscience
    • Jill Dougherty on Ten Shots and a Phone
    • JB on Ten Shots and a Phone
    • Jill Dougherty on Ten Shots and a Phone
    • Lucas Pregjidorian on Ten Shots and a Phone
    • Jill Dougherty on Ten Shots and a Phone
    • TJ hall on Ten Shots and a Phone
    • JB on Ten Shots and a Phone
    • JB on Ten Shots and a Phone
    • JB on Ten Shots and a Phone
    • Hunter Biden on Ten Shots and a Phone
    Archives
    A Step Up
    The Sedonan
    The Sedonan Summer 2025
    Ode to Sleeplessness
    © 2026 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.