Close Menu
Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    • Home
    • Sedona
      • Steve’s Corner
      • Arts and Entertainment
      • Bear Howard Chronicles
      • Business Profiles
      • City of Sedona
      • Goodies & Freebies
      • Mind & Body
      • Real Estate
      • Sedona News
    • Opinion
    • About
    • The Sedonan
    • Advertise
    • Sedona’s Best
    Sedona.Biz – The Voice of Sedona and The Verde ValleySedona.Biz – The Voice of Sedona and The Verde Valley
    Home » ADOT: SR 89A rockfall mitigation work in Oak Creek Canyon completed
    Arizona

    ADOT: SR 89A rockfall mitigation work in Oak Creek Canyon completed

    Traffic restrictions along the highway’s switchbacks section lifted
    October 18, 2024No Comments
    Facebook Twitter Pinterest LinkedIn Email Reddit WhatsApp
    stock azdot SR89AOakCreekPavingAlongSwitchbacksPartOfProjectsADOTcircaFall2024
    Share
    Facebook Twitter LinkedIn Pinterest Email Reddit WhatsApp

    Sedona News – A series of highway improvement projects which included rockfall mitigation in the area of the State Route 89A switchbacks in Oak Creek Canyon north of Sedona has been completed, according to the Arizona Department of Transportation.

    stock azdot SR89ARockfallErosionControlProjectSiteADOTfileJune2024BTraffic restrictions south of the SR 89A Oak Creek Vista scenic overlook have been lifted.

    Three ADOT projects allowed crews to remove loose material and stabilize a cliff face along the switchbacks where a rockslide occurred in March 2023, as well as remove a large rock overhang just north of the city of Sedona. The SR 89A Pumphouse Wash Bridge near the switchbacks was improved and ADOT’s team has now finished an erosion and sediment control project.

    Own In Sedona

    Own In Sedona

    Sedona Gift Shop

    That recently completed project included the installation of a new pipeline to direct storm runoff away from the switchbacks area cliff face and into an improved culvert that carries the water toward Oak Creek. Construction contracts for the three projects totaled $11.1 million.

    ADOT and its project team collaborated with local and regional safety agencies to maintain emergency vehicle access and be prepared for events, including wildfires, that might require a response.

    Real-time highway conditions are available on ADOT’s Arizona Traveler Information site at az511.gov, the az511 app (download for Apple or Android devices) or by calling 511.

    Own In Sedona

    Comments are closed.

    Trust

    Trust. We must trust our president. He knows what he is doing, and when he is done with Iran there will be peace and stability in the world. His ordering of the attack on Iran and the killing of the Ayatollah was the right thing to do.

    Click Here for More

    Sedona Real Estate
    230 Table Top Rd
    The Sedonan
    The Sedonan Summer 2025
    Recent Comments
    • TJ Hall on Trust
    • JB on Forbidden Island
    • Gail on Trust
    • TJ Hall on Trust
    • Jill Dougherty on Trust
    Categories
    Cactus Quill
    © 2026 All rights reserved. Sedona.biz.

    Type above and press Enter to search. Press Esc to cancel.